Optimal DG Placement with the Aim of Profits Maximization
Abstract
Using distributed generation power plants is common due to advantages such as system capacity release, voltage support and reduced energy losses in power networks. Prior to the creation of distributed generation plants (DG), economic calculation is needed in order to find the optimum location. In this study, IEEE 57 bus test system is evaluated using two index of LMP and CP. Then, the optimal location of distributed generation plants is studied in experimental network. Finally, the effects of DG correct location on buses LMP after DG installation is studied.
Keywords
Full Text:
PDFDOI: http://doi.org/10.11591/ijeecs.v1.i2.pp249-254
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Indonesian Journal of Electrical Engineering and Computer Science (IJEECS)
p-ISSN: 2502-4752, e-ISSN: 2502-4760
This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).