Early Test Effort Prediction using UML Diagrams

Pulak Sahoo, J R Mohanty

Abstract


Software Testing is essential for delivering quality software products. Accurate test effort estimation is an important part of project planning. Prediction of test effort at early phases of Software Developmen Life Cycle enables managers to plan ahead for the testing phase. This increases the chances of the project meeting its timeline while achieving required quality. Unified Modeling Language is a widely-used standard for representing Object Oriented Systems. Use Case and Class Diagrams are two of the most important models of the system created during early phases of software development. This work proposed that the initial test effort is predicted early using Use Case Diagram during the requirement stage and is refined during design stage when Class Diagrams are available. The predicted test efforts in both stages are functions of parameters derived from Use Case and Class Diagrams. Estimations can be revised when rest of the UML diagrams are created.


Keywords


Use case diagram, Class diagram, Use case points, Class point, TEI

Full Text:

PDF


DOI: http://doi.org/10.11591/ijeecs.v5.i1.pp220-228

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Indonesian Journal of Electrical Engineering and Computer Science (IJEECS)
p-ISSN: 2502-4752, e-ISSN: 2502-4760
This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).

shopify stats IJEECS visitor statistics