Cost estimation methods for internet infrastructure deployment in Rural Sarawak: a review
Abstract
In rural Sarawak, the internet accessibility is low due to unreliable power grids to support telecommunication network and large geographical area. The risk for network infrastructure implementation is high for internet service provider (ISP), thus more practical and accurate cost estimation methods should be used. This paper reviews different types of cost estimation methods and the accuracy and feasibility of each methods are discussed and compared for network infrastructure implementation in rural Sarawak. The unique characteristics of rural Sarawak are considered in this work, including the topography, development of rural areas and acceptance of new technologies. Different cost estimation methods are identified for different senarios and availability of data.
Keywords
Full Text:
PDFDOI: http://doi.org/10.11591/ijeecs.v19.i3.pp1375-1383
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Indonesian Journal of Electrical Engineering and Computer Science (IJEECS)
p-ISSN: 2502-4752, e-ISSN: 2502-4760
This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).