Analysis on Service Life of Hot-end Components of Gas Turbine Using Equivalent Operation
Abstract
The reliability of the gas turbine depends on the technical status and the maintenance level of the hot-end components in a large part.The three main factors influencing on the service life of the hot-end components of the gas turbine were analyzed first.On this basis,various common service life assessment methods for gas turbine were discussed in detail.Aiming at the features of the M701F gas-steam combined cycle unit in Huizhou LNG power plant,a gas turbine life assessment method based on equivalent operation time analysis was put forward.The calculation result of an example shows that the equivalent operation time analysis method is a simple and practical assessment method.
Full Text:
PDFRefbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Indonesian Journal of Electrical Engineering and Computer Science (IJEECS)
p-ISSN: 2502-4752, e-ISSN: 2502-4760
This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).